• Your office

    Your office

Our Building

Stacking plan

  • Skyview floor L48-50
    • Blackbyrd L50
    • Dragonfly L50
    • Blank Space L49
    • Dewakan L48
    • Sushi Den L48
  • High Zone L28-50
    • Badminton World Federation
    • KIA Motors Asia Pacific Headquarters
    • Lloyd’s Register of Shipping (M) Bhd
    • TTDI KL Metropolis
    • Naza Corporation Holdings Sdn Bhd
    • City View Ventures Sdn Bhd
  • Transfer Floor L31
    • Epique Fitness L31
  • Low Zone L10-27
    • The State of The Netherlands
    • Capitaland Commercial (M) Sdn Bhd
    • Swiss Reinsurance Company Ltd
    • Wood Group Mustang (M) Sdn Bhd
    • AHB Technology Sdn Bhd
  • Amenities Floor L10 - L11
    • Clinic L11
    • Surau L11
    • Eating Hall L10
  • Podium Parking P2-P9
  • Lobby
  • Basement Parking

Building

Specification

  • Double grazed window for optimum heat and sound insulation.
  • FIRE FIGHTING SYSTEM

    • Address fire alarm system, Public Announcement system and sprinkler  system
    • Wet riser & hose reel system
    • CO2 gas suppression system for Gen Set and consumer electrical room
    • IG 55 clean agent gas suppression provided at fire control room

    SMOKE CONTROL SYSTEM

    • Staircase pressurization (all enclosed staircase)
    • Lift Lobby Pressurization System Fireman LiftLobby
    • Smoke Spill System
    • Access card control system inside the lift
    • Turnstile at ground floor main lift lobby
    • CCTV cameras inside the lifts, lift lobbies and car park driveway
    • Security guards patrol
    • 2.7 meter (floor to ceiling)
    • 4 meter (floor to slab)
    • Under floor trunking
    • T8 Fluorescent with high frequency electronic ballast
    • Power : 2 distribution boards power supply of 60A TPN per floor
    • Power Loading : 60Watt/m2 (per tenant/floor)
    • Power allocation : 120 Amps (per tenant/floor)
    • A/C System : Chilled water system
    • A/C Control System : 22 to 28 zones per floor controlled via VAV and AHU System
    • Operating hours : 8:30 a.m. - 6.00 p.m. (Monday - Friday)
    • Fiber optic backbone
    • Low Zone - 6 DEDICATED LIFTS @ 4m/s
    • High Zone - 6 DEDICATED LIFTS @ 4m/s
    • Shuttle Lifts - 4 DEDICATED LIFTS @ 4m/s
    • Car Park Lifts - 2 lifts @ 1.75m/s